Page 69 - OP DSD 2022 FINAL FINAL
P. 69

ANNUAL OPERATIONAL PLAN 2022/2023




        Outcome  Output    Activities            Risk De-   Root caus-  Conse-    IR     Existing con-  RI       Risk Owner  Action   Action    Action    Action
                                                 scription  es         quences           trols                              Plans     Start     Owner     Due Date
                                                                                                                                      Date
        Imple-   Minimum   Procurement  of  twen- If equip-  Age of    If equip-  Medi-  Existing SCM   Low      Director:   Timeously  April   Director:   March:
        menta-   Physical   ty  (20)  24  port  10  Giga- ment is not  equipment  ment is not  um  process and   Security   complete   2022     Security   2023
        tion of   Security   bit  Ethernet  Network  main-             maintained        regulations             Manage-    investiga-          Manage-
        physical   Standards  Switches  for  the  Elec- tained and     and ser-                                  ment       tion                ment
        security  (MPSS)   tronic  Security  System  serviced          viced on
                 and the   (ESS)  for  cameras  and  regularly, it     a regular
                 Minimum   access  control  readers  drastically       basis it
                 Infor-    9  floor.             reduces the           drastically
                            th
                 mation                          lifespan              reduces
                 Security   Procurement of two new   of the            the lifes-
                 Standards   X-ray machines for HSRC   equipment       pan of the
                 (MISS)    Building.             as well as            equipment
                 Imple-                          leads to              as well as
                 mented.                         disruptions           leads to
                                                 in security           disruptions
                                                 operations            in security
                                                 as ESS                opera-
                                                 systems               tions. X-ray
                                                 provide a             equipment
                                                 supportive            is part of
                                                 function to           the access
                                                 operational           control
                                                 security              system as
                                                                       per Control
                                                                       of Access
                                                                       to Public
                                                                       Premises
                                                                       and Vehi-
                                                                       cles Act.
        Facilities   New   Approved submission   Delays in   Lack of an   Delays in   Low  Existing SCM   Low    Director:   Liaise   April     Director:   March:
        Manage-  cleaning                        the pro-   approved   the pro-          process and             Security   with re-  2022      Security   2023
        ment     service so   TOR approved by the   curement   budget   curement         regulations             Manage-    sponsible           Manage-
                 that the   BSC and BAC.         process               process                                   ment       managers            ment
                 buildings                                                                                                  for SCM
                 are main-  SCM Tender process.                                                                             and legal
                 tained in                                                                                                  services
                 a good,                                                                                                    process-
                 clean and  Appointment of the Bid                                                                          es
                 safe con-  Evaluation Committee
                 dition and  (BEC) for the cleaning
                 deliver   services tender.
                 effective
                 and re-   Approval by BAC of the
                 sponsive   service provider.
                 services
                           Legal Service approve
                           contract by signing off
                           by the DG.


                                                                                                                                                                69
   64   65   66   67   68   69   70   71   72   73   74